York Floor Ceiling R-410A 50Hz Service Manual Page 308

  • Download
  • Add to my manuals
  • Print
  • Page
    / 385
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 307
Controller
___________________________________________________________________________________
- 307 -
c. The running state data of different air-conditioners can be queried by pressing “Previous” or
“Next” to select the address.
5) Running Mode Setting Page Display
Running Mode Setting Display only has one page. And display the selected mode, auxiliary
function and the selected operation state.
6) Installation
1. Adopt Electrical Switch Box
The diameter of Central Control Monitor wire must be suitable for its length.
Electrical wiring tube must be suitable for the wires.
Turn a screwdriver at the concave on bottom panel of the Central Control Monitor to remove
the cover.
NOTE
z Never turn screws too tightly, otherwise the cover would be dented, or the Liquid Crystal
would be broken.
z Do not cut wires when installing the cover of Central Control Monitor.
2. Installation
Terminals P, Q, E at the back of CCM are connected to the terminal P, Q, E of PC.
The CCM power connects 220V~ 50Hz power directly to the terminal L, N,
At the
back of wire controller.
1) The communication cable of CCM and power cable should not be placed in the same
electrical wire tube and the two tubes should have 300-500mm distance.
2) The length of CCM communication cable should not exceed 1200m.
Page view 307
1 2 ... 303 304 305 306 307 308 309 310 311 312 313 ... 384 385

Comments to this Manuals

No comments