York Floor Ceiling R-410A 50Hz Service Manual Page 274

  • Download
  • Add to my manuals
  • Print
  • Page
    / 385
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 273
Installation
___________________________________________________________________________________
___________________________________________________________________________________
- 273 -
6.3) Drainage pipe insulation
The connection part should be insulated, or else water will be condensing at the non-
insulation part.
6.4) Note
(1)The jointing area, expanding area and the flange area should be heat insulated after passing
the pressure test
(2) The gas and liquid pipe should be heat insulated individually, the connecting part should be
heat insulated individually.
(3) Use the attached heat-insulation material to insulate the pipe connections (pipes’ tie-in,
expand nut) of the indoor unit.
Page view 273
1 2 ... 269 270 271 272 273 274 275 276 277 278 279 ... 384 385

Comments to this Manuals

No comments