General information
___________________________________________________________________________________
___________________________________________________________________________________
- 12 -
(7) Simple installation and easy maintenance.
Easy installation
The structure of the YDS system and the piping work are simple, thus the installation is
easy.
Indoor units installation: Whole series indoor units have the same gas/liquid connection
size for R-410A ,and by flare nut connection, it is easy to connect and decrease your installation
cost up to 30%.
Independent system
The YDS system can be installed by stages and the owners can install their system at
their convenient time. Thus the system has less installation time limit.
- Installation by stages can avoid the non installment for the new project.
- Convenient installation is realized for the rebuilt project.
No need special maintenance work
Simple refrigerant piping system without any complicated maintenance work
Compared with the water-cooled system:
Without water-cooled system, there is no need to clean the water pipe
No full-time person is needed to do the maintenance work
Module construction enables the system to be free from large-scale repair regularly.