York Floor Ceiling R-410A 50Hz Service Manual Page 261

  • Download
  • Add to my manuals
  • Print
  • Page
    / 385
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 260
Installation
___________________________________________________________________________________
___________________________________________________________________________________
- 260 -
1) Install pressure modulation valve at the nitrogen cylinder. And the gas used must be
nitrogen. Carbon Dioxide will probably condense. And Oxygen will probably cause explosion.
2) Use charge pipe to connect pressure modulation valve and outdoor liquid pipe.
3) Jam well all the connection part in liquid side except indoor unit A.
4) Open the valve of nitrogen cylinder to 5kgf/cm2.
5) Check if there is nitrogen in liquid pipe of indoor unit A.
6) Flushing
Use the insulating material in hand to resist the nozzle of gas main pipe of the indoor
unit.
When the pressure can’t be resisted, release the insulating material quickly (flushing for
the first time), then use the insulating material to resist the nozzle again (flushing for the second
time).
The dunghill can be checked by putting a piece of cloth in the nozzle loosely. Occasionally,
some dampness can be found, please dry the pipe thoroughly. Do as follows:
Scouring the inner part of the pipes with nitrogen until no dampness.
Page view 260
1 2 ... 256 257 258 259 260 261 262 263 264 265 266 ... 384 385

Comments to this Manuals

No comments