York Floor Ceiling R-410A 50Hz Service Manual Page 257

  • Download
  • Add to my manuals
  • Print
  • Page
    / 385
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 256
Installation
___________________________________________________________________________________
___________________________________________________________________________________
- 256 -
Envelop End: Welding the leak while clamping the end of the pipe.
Wrapping: Wrapping the pipe with polyethylene insulation tape.
The following operation should be noted:
- When putting the pipe through the hole, filth can easily enter into the pipe.
- When the pipe is outside, rainwater can easily enter into the pip, especially when the
Pipe is placed vertically.
Precautions:
Protect the open end of the pipe against moisture, dust and litter.
Before finishing pipe connection, place a cap at the open end of the pipe.
Try to make the open end of the pipe thwart or downward.
A cap must be placed on the end of the pipe when the pipe crosses the hole in the wall.
Page view 256
1 2 ... 252 253 254 255 256 257 258 259 260 261 262 ... 384 385

Comments to this Manuals

No comments