5 COMMISSIONING
5.1 Preparation
Commissioning of this unit should only be
carried out by York authorised personnel.
The Operating Instruction manual must be read in
conjunction with this section.
Preparation - Power Off
The following checks should be made with the customer
supply/supplies to the unit switched off.
Inspection: Inspect unit for installation damage. If
found take action and/or repair as appropriate.
Valves: Open the oil separator valve, liquid line service
valve, oil system, unloader and liquid injection service
valves.
Compressor Coupling Alignment: Verify that the
compressor drive coupling is correctly aligned.
Refrigerant Charge: Units are normally shipped as
standard with a full refrigerant operating charge. Check
that refrigerant is present and that no leaks are apparent
(the refrigerant level should be in the middle of the
evaporator sight glass). If no refrigerant is present a leak
test must be undertaken, the leak(s) located and
repaired. Repaired systems and units supplied with a
nitrogen holding charge must be evacuated with a
suitable vacuum pump/recovery unit as appropriate
(refer to Section 7 for details).
Oil System: Check the oil system is correctly charged
and the oil level is visible in the upper sight glass on the
oil separator.
Isolation/Protection: Verify that all sources of
electrical supply to the unit are taken from a single point
of isolation.
Control Panel, Motor Terminal Box or Solid State
Starter: Check the panels to see that they are free of
foreign materials (wire, metal chips, etc.) and clean out if
required.
Power connections: Check the customer power
cables are connected correctly.
Earthing: Verify that the units protective terminal(s) are
properly connected to a suitable earthing point. Ensure
that all unit internal earth connections are tight.
Supply voltage: Verify that the site voltage supply
corresponds to the unit requirement and is within the
limits given on the unit data plate.
The customers disconnection devices can now be set to
ON.
The machine is now live!
Oil Heater: Verify the oil heater is energised for at least
24 hours prior to start-up.
Compressor Motor: Check the phase rotation
sequence of the incoming supply corresponds to the
required rotation for the motor.
Water/Glycol system(s): Verify that the cooling and
chilled water systems have been installed correctly, and
commissioned with the correct direction of water flow
through the condenser and cooler. Purge air from the
top of the condenser and cooler using the plugged air
vents.
Flow switch(es): Verify a chilled water flow switch is
correctly fitted in the customers pipework on the cooler
outlet, and wired into the control panel.
Temperature sensor(s): Ensure the temperature
sensors are coated with heat conductive compound
(Part No. 013-00890-000) and inserted into the sensor
pockets.
Programmed options: Verify that the options factory
programmed into the control centre are in accordance
with the customers order requirements. Refer to the
Operating Instructions for details.
Programmed settings: Ensure the system setpoints,
cut-outs and operational settings are in accordance with
the instructions given in the Operating Instructions.
Date & time: Programme the date and time (see
Operating Instructions).
Start/Stop schedule: Programme the daily and holiday
start/stop (see Operating Instructions).